
How to Review Commercial Lease Insurance Rent and Uninsured Risk in England
Mark what insurance rent recovers, whether commission needs express words, and what silence on Uninsured Risks does for repair and rent suspension.
Key takeaway in 30 seconds
Insurance rent on an England business lease recovers only what the wording allows — usually a fair proportion of the premium payable for keeping the building insured. Match the Insured Risks list to the policy schedule and excesses. Silence on Uninsured Risks can leave the tenant repairing and still paying rent. Mark the gaps, then narrow or walk.
To review commercial lease insurance rent and uninsured risk in England, put the insurance block beside the policy summary. Check what the demand recovers as premium, whether commission needs express words, and whether the Insured Risks list matches the schedule and excesses. Then ask what silence on Uninsured Risks does to repair, rent suspension, and terminate-or-reinstate — and narrow that block or walk.
Clause 6.2 recovers a fair proportion of the premium payable for keeping the Building insured and does not name commission. Clause 6.1 lists flood among Insured Risks, subject to exclusions, limitations, excesses, and market availability — yet the 28 September 2026 policy summary excludes flood for this postcode. Start with that gap between the demand and the policy.
The agent email of 8 October 2026 treats commission as always inside the premium, listing flood as proof of cover, and silence as proof the landlord rebuilds and rent always stops. Test those three claims against the lease and the summary. Lowenna at Caldey Shore Ltd, Tenby, is reviewing Unit 1 Harbour Yard under English law; decision Friday 16 October 2026.
Disclaimer: Checkory provides AI support, not legal advice. Consult a qualified lawyer for binding decisions.

Who places buildings insurance, and what does insurance rent recover?
The landlord places the buildings policy. Under clause 6.1 the landlord insures the Building against the Insured Risks for full reinstatement and three years’ loss of rent. Under clause 6.2 the tenant pays as Insurance Rent a fair proportion of the premium payable for keeping the Building insured.
On the usual landlord-insured model Stevens & Bolton and Sprintlaw treat insurance rent as reimbursement of the buildings premium and loss-of-rent cost — not contents, public liability, or business interruption. The wider office-lease review sits in the commercial office lease checklist for England. A vendor certificate on supply or SaaS paper is different — see the vendor insurance requirements checklist. There is no Harbour Yard premium figure here.

Does listing flood among Insured Risks mean the shop is covered?
No. The list is not the schedule. Clause 6.1 names flood and subjects Insured Risks to exclusions, limitations, excesses, and market availability. The 28 September 2026 summary excludes flood for this postcode and states a £2,500 escape-of-water excess. Typical mistake: treat the flood listing as cover when the summary excludes it.
Stevens & Bolton advise tenants to obtain the policy and watch exclusions. Taurus warns that the lease list is not the schedule. Clause 6.3 makes Lowenna pay a fair proportion of any excess. Clause 6.1 includes three years’ loss of rent; clause 6.4 suspends yearly rent after Insured Risk damage until the Premises are fit again or that period ends, whichever is earlier. Mark “listed / excluded” before Friday.
When can landlord commission sit inside the insurance-rent demand?
Only when the lease wording recovers it. Clause 6.2 says “premium payable … for keeping the Building insured” and does not name commission. In London Trocadero [2025] EWHC 1247 (Ch), rebated landlord commission was held not to be that premium on that wording; a 35% placement fee failed too. Shoosmiths, 29 May 2025, advises a breakdown. That helps you read clause 6.2; it is not a finding that Castle Reach took a rebate. In practice, MCL 1.9 notes (7 August 2026) add express landlord commission because premium-only wording failed. Clause 6.2 lacks that wording. Ask for a breakdown.
Premium-only (clause 6.2)
Pros
- ✓Recovers premium payable for keeping the Building insured
Cons
- ✗Does not name commission; email is not the lease
Express commission (MCL 1.9)
Pros
- ✓States reasonable and proper landlord commission after Trocadero
Cons
- ✗Not inserted into this PDF by the model notes alone

What does silence on Uninsured Risks do to repair, rent, and rebuild?
Silence does not create a landlord rebuild duty from the premium alone. Clause 4.1 keeps the Premises in repair except Insured Risk damage, with no Uninsured Risk carve-out. Clause 6.4 suspends yearly rent only after Insured Risk damage, and clause 6.5 applies insurance money only after that damage. There is no Uninsured Risk definition, no twelve-month election, and no tenant terminate right if reinstatement stalls. Penman Sedgwick and Greenwoods warn that Insured Risks-only repair and suspension can leave the tenant repairing and still paying rent. The CLLS specimen shows a fuller Uninsured Risk election. Do not treat it as already agreed. Day-to-day repairing sits in the FRI covenant review for England. Do not treat “FRI already covers this” as a reason to skip the insurance gap.
How do you use Lease Code 2020 with a silent clause 6?
Use it as a negotiation checklist, not a signed amendment. The RICS Code for leasing business premises (February 2020, reissued September 2023) is not a statute inserting words into clause 6. Part 9 expects rent suspension for insured and, other than tenant default, uninsured damage; termination if significant reinstatement is unfinished in the suspension period; and terminate-or-reinstate if uninsured damage prevents normal use. Landlords should disclose commissions and pass on discounts. Put those expectations beside clause 6’s silence — the Code does not already suspend rent under this draft. Narrow the clause or walk.

Insurance-block marks before Friday
Write the five marks: premium payable without commission words; flood listed but excluded; £2,500 excess and three years’ loss of rent; commission silence unlike MCL 1.9; no Uninsured Risk election and Insured Risks-only suspension. If commission, cover, and the uninsured election still rest on the email, narrow clause 6 or do not sign Friday 16 October 2026. Verify each mark before you sign.
If you keep negotiating, define recoverable insurance rent without undeclared landlord profit, require policy evidence, carve Uninsured Risks out of repair, extend suspension, and add a time-limited reinstate-or-terminate election. A first-pass — a machine extract ahead of a full human read — does not choose. Upload the draft via document analysis and the England lease review tool. Then narrow the clause or walk.
Work the marks in order: 6.1–6.2, policy summary, commission, silence in 4.1 / 6.4 / 6.5, Lease Code part 9, five marks — narrow or walk.
Five insurance-block marks
| Mark | Write | ||
|---|---|---|---|
| What 6.2 recovers | Premium payable | Commission always inside | No commission words |
| List versus schedule | Flood listed; summary excludes | Flood word means cover | Listed / excluded |
| Excess and loss of rent | 6.3 excess; 6.1 three years | Not worth negotiating | £2,500; three years |
| Commission clawback | Silent | Trocadero changes nothing | Ask for a breakdown |
| Uninsured election | Insured Risks only | Landlord rebuilds; rent stops | No election |
Review this insurance block before Friday
Open who insures and what 6.2 recovers
Read clause 6.1–6.2 and the 28 September 2026 summary. Note premium payable, not contents or business interruption.
Match the list to the schedule
Mark flood listed and flood excluded. Note the £2,500 excess and three years’ loss of rent.
Test commission wording
Compare premium-only clause 6.2 with Trocadero and MCL 1.9. Ask for a breakdown.
Map the uninsured gap
Read clauses 4.1, 6.4, and 6.5 against the missing Uninsured Risk election.
Use Lease Code part 9 as a checklist
Note uninsured suspension, terminate-or-reinstate, and commission disclosure.
Narrow or walk
Write the five marks. If the email still carries commission, cover, and rebuild, narrow or do not sign Friday.
Frequently asked questions
Can a landlord add commission to insurance rent on an England commercial lease?▼
Does listing flood in Insured Risks mean the tenant is covered for flood?▼
Does rent stop when the premises are damaged by an uninsured risk?▼
Who rebuilds if flood is excluded and there is no Uninsured Risk clause?▼
Does the Lease Code 2020 already amend a silent insurance clause?▼
Is reviewing insurance rent the same as reviewing an FRI repairing covenant?▼
Mark clause 6 before Friday
Upload the draft and extract insurance rent and the uninsured gap.
Start document analysisWhat to do next
Document analysis
Upload the draft and extract clause 6, the Insured Risks list, and the uninsured gap.
ToolCommercial lease review tool for England
Point the same draft at the England commercial-lease review.
RelatedCommercial office lease checklist for England
Insurance rent is one block. The rest of the lease sits in the published checklist.
RelatedFull repairing and insuring covenant review for England
Day-to-day repairing and schedules of condition are a different review from this insurance block.
RelatedHow to Review a Commercial Lease Break Clause in England
Open the sibling checklist after this screen.
Sources
- London Trocadero (2015) LLP v Picturehouse Cinemas Ltd [2025] EWHC 1247 (Ch)
- Shoosmiths, Insurance rent: what’s in a premium? (29 May 2025)
- Model Commercial Lease — Update Notes for version 1.9 (7 August 2026)
- Stevens & Bolton, Insurance in commercial leases (20 September 2023)
- Sprintlaw UK, Insurance rent meaning (2 March 2026)
- Taurus Risk, Commercial property insurance responsibility
- Penman Sedgwick, Commercial leases and uninsured risks (22 January 2024)
- Greenwoods, Uninsured risks and commercial leases (4 October 2022)
- RICS Code for leasing business premises, England and Wales, 1st edition PDF
- CLLS Land Law Committee specimen insurance provisions (March 2014)
Read also
Related guides





