How to Review a Key-Person Replacement Notice in a PSA

Write named people on the SOW, log notice days before a planned swap, approve a same-seniority same-clearance substitute, then overlap or walk.

9 min readArticle
💡

Key takeaway in 30 seconds

Knowing how to review a key-person replacement notice in a psa means writing the named people on the SOW, not a suitably qualified team, logging notice days before a planned swap, requiring your written approval of a substitute at the same seniority and same security clearance, and insisting on a ramp-down overlap at the supplier's cost. Then name, notice, or walk.

Willa, Ops at a 19-person UK agency, is about to treat the named lead on the SOW as a courtesy. Finance signed off. Knowing how to review a key-person replacement notice in a psa is a 25-minute hunt: write named people, log notice days before a planned swap, require your written approval of a same-seniority same-clearance substitute, then insist on a ramp-down overlap.

September 2026. English law; exclusive courts of England and Wales. The packet — PSA, SOW, and any personnel exhibit — attached schedule or appendix, dated today. Not HMRC’s PAYE Settlement Agreement. SOW line 3 names the Engagement Director. Clause 8: “Supplier may replace personnel with suitably qualified staff.”

No notice days. No prior written approval. No same seniority or same BPSS or SC. No overlap. AE Slack: “You’ll always have a suitably qualified team — that’s the point.” The named lead pitched in July; client work sits in that person’s head. Friday is booked. The rush is the problem. The hidden risk is a pointer, not a lock. The AE line is the pressure that lets her sign.

A name on the SOW is not a lock — and “suitably qualified” is the supplier marking their own homework. CCS Call-Off Schedule 7: a planned Key Staff change wants at least three (3) months’ notice, incoming and outgoing staff working together, and a vacancy cap of ten (10) working days. Clause 8 has none of that. Canada’s Procurement Ombud (2025): in ArriveCAN-related files, 76% of applicable contracts had some or all proposed resources perform no work.

Disclaimer: Checkory provides AI support, not legal advice. Consult a qualified lawyer for binding decisions.

Named-person line with replacement-notice days and approval box, no face
Named-person line with replacement-notice days and approval box, no face

Which names sit on the SOW — a named lead, or a suitably qualified team?

A name without a replacement machine is a pointer. Circle SOW line 3 and clause 8. If a courtesy name sits next to “suitably qualified staff,” you bought an adjective, not a person. Write the exact names and roles, or log “suitably qualified only — fail.”

Do: demand Key Personnel with names and titles. Don’t: treat the pitch-lead as locked because the SOW typed them. For example, IUCN’s February 2026 template assigns “[name and title] as Key Personnel” and requires written advance approval of any replacement. GovDash (August 2026) still treats a named individual as a bid commitment, not an HR signature.

Named lead on the SOW versus a suitably qualified team, no face
Named lead on the SOW versus a suitably qualified team, no face

Typical mistake

“The named lead is on the SOW so we bought that person” treats a pointer as a lock while clause 8 lets them swap suitably qualified staff with no notice.

What does a planned swap require in notice days?

Circle the missing number. A planned rotation can happen on a silent Monday if the paper has no days. Illness, death, and resignation with less than the planned floor need maximum notice practicable — not a cover story for moving the lead. Log planned-swap days versus “no days — fail.”

CCS Schedule 7 wants at least three (3) months for a planned change — key person leave notice days sit in that row. VAAR 852.237-75 wants at least 30 days before a voluntary diversion. CAR 1352.237-75 wants at least 15 working days plus complete résumés. North Ayrshire (April 2026) wants one month’s written notice — Scotland colour, not England-and-Wales statute. Put the number in the paper. Do: split planned versus illness. Don’t: invent a “fair” 30 days as law. In practice, ask in writing: leaving, or moving accounts?

Willa’s replacement log

RowWilla’s paperWrite
Named peopleSOW name + suitably qualified staffExact names/roles as Key Personnel
NoticeNoneDays for a planned swap; max practicable if ill
ApprovalSupplier self-certifiesWritten yes, CV, interview, same grade + clearance
OverlapNoneSide-by-side days at supplier cost
Who paysShe funds a costly rampSupplier pays replacement and delay
Notice-days row for a planned swap versus illness, no face
Notice-days row for a planned swap versus illness, no face

Why does the substitute need the same seniority and the same clearance?

“Suitably qualified” is the supplier’s adjective. Same title is not same seniority, and a badge does not teleport clearance. Named consultant replacement approval is her written yes — not unreasonably withheld is a common compromise — plus CV, interview, reject, same grade, same BPSS or SC.

Bidwell on BPSS, SC, DV: BPSS is typically 5–10 working days; SC typically 6–12 weeks, requires sponsorship, and must be transferred. A substitute still in the SC queue is not cleared. CAR wants equal-or-exceeding credentials and a decision in 10 working days. Afterpattern key-personnel samples give a CV and an interview right. Do: tick substitute same seniority and same clearance as two rows. Don’t: let them self-certify “suitably qualified.”

When to insist on a ramp-down overlap so knowledge does not walk out?

If there is no overlap, knowledge walks out with the named lead and she still pays a costly ramp. Require side-by-side days at the supplier’s cost, written in the paper. Log overlap days, who is on the clock, who pays — or “no overlap — fail.”

CCS wants incoming and outgoing staff working together. Lakeland PSA Section 24 (15 June 2026) wants a transition of at least one (1) week; the consultant pays replacement and delay costs. StepTo (31 July 2026) treats a 30-day paid overlap as a continuity ask for a substantive role. Do: supplier pays the overlap. Don’t: hope the new person will pick it up.

Ramp-down overlap of outgoing lead and incoming substitute, no face
Ramp-down overlap of outgoing lead and incoming substitute, no face

Which fight is this — not a non-solicit, and not the whole PSA?

Stay on named people, notice days, substitute approval, and overlap. Time with counsel — your England-and-Wales solicitor — spent on hiring-their-people or a nine-section PSA tour is the wrong hunt.

If the fight is hiring their people, that is a different hunt: employee non-solicit review. If the fight is the whole PSA wrapper, that is a different hunt: professional services agreement checklist. Open line 3 and clause 8, not only the heading “Personnel.” Do: one sentence to each neighbour. Don’t: clone a hire-away fee or a T&M, IP, or cap tour here.

How do you name, notice, or walk?

Name only if the log shows named people the PSA cannot silently swap, notice days, written approval at same seniority and same clearance, and a ramp-down overlap at supplier cost. Notice means redline those four. Walk if suitably qualified plus no days plus no approval plus no overlap remain. Escalate that package. Pause the slot.

Success bar: a one-page log plus one Friday pause sentence. Workflow: named people vs suitably qualified → notice days (planned vs illness) → approval + same seniority/clearance → ramp-down overlap → not B35 / not B29 → name / notice / walk. Verify line 3 and clause 8 before you sign. Optional: upload the same PDF to document analysis for a first-pass — first machine pass that extracts clauses before a human reads every page — and a human still opens line 3 and clause 8. Verify every High flag — a severity-high finding a named human still opens.

Hunt

1

Freeze the packet

PSA + SOW + personnel exhibit, dated today. Search named / suitably qualified / notice / approval / overlap. Open line 3 and clause 8.

2

Hunt the named people

Circle the SOW name and “suitably qualified staff.” Exact names and roles, or pointer — fail.

3

Hunt notice days

Circle the missing number. Log days for a planned swap versus maximum practicable for illness. Ask: leaving, or moving accounts?

4

Hunt approval of the substitute

Written approval, CV, interview/reject, same seniority, same BPSS or SC. Self-certifies = fail.

5

Hunt ramp-down overlap

Side-by-side days, who is on the clock, who pays. No overlap = knowledge walks.

6

Name, notice, or walk

Name only if all four rows hold. Notice = redline the four. Walk if suitably qualified + no days + no approval + no overlap remain.

Frequently asked questions

Can they swap the lead on day two?
Yes, if the SOW names a person but the PSA lets them replace “suitably qualified staff” with no lock. Log day-two as a fail unless names, notice, approval, and overlap sit in the paper.
Do we interview the substitute?
Write the right to interview and reject, plus a CV, into the paper. Afterpattern samples give a replacement résumé and an interview. Self-certifying “suitably qualified” is a fail.
What if the named person is ill?
An emergency carve-out is normal — still prompt written notice, an approved substitute, and as much overlap as circumstances allow. Do not let “ill” cover a planned rotation. Ask in writing: leaving, or moving accounts?
Does same seniority mean same security clearance?
No. Same grade is one tick; same BPSS or SC is another. Bidwell colour: SC typically takes 6–12 weeks and must be transferred. A substitute in the clearance queue is not the named lead.
Is this the same as a non-solicit on their employees?
No. Stay here for them swapping the named lead. Hiring their people is an MSA — master services agreement around the order form — hunt (https://checkory.com/en-gb/blog/vendor-msa-employee-non-solicit-review).
If we already reviewed the whole PSA, are we done?
No. The whole-wrapper checklist is a different hunt (https://checkory.com/en-gb/blog/professional-services-agreement-review-checklist).

Highlight the replacement clause

Upload the same PDF. A human still opens line 3 and clause 8.

Start document analysis