How to Review Green-Lease MEES and EPC Cost Allocation in England
Mark who carries MEES duty, whether clause 8.3 recovers upgrades, what clause 9 does to access and rating, and whether the 2031 Band B proposal bites.
Key takeaway in 30 seconds
Under England and Wales non-domestic MEES, the letting prohibition and the penalty sit on the landlord. The lease still decides who pays for upgrades, who must open the door, and what rating you return. Today's letting floor remains EPC E; a proposed EPC B from 2031 for buildings over 1,000 sqm still needs secondary legislation. Mark clauses 8.3 and 9 against the heads, then narrow the cost allocation or walk.
Separate the landlord’s MEES duty from the payment, access, and rating clauses. Map today’s EPC E floor against the June 2026 proposal for this building. Mark Service Costs and clause 9, then narrow those words or walk.
The 2015 Regulations put the letting prohibition and the penalty on the landlord. Clauses 8.3 and 9 still decide who pays for upgrades and who must open the door. A cooperation promise is not the whole of that clause set.
In October 2026 Bronwen, operations lead at Severn Clay Ltd, reviews Unit 6 at Raven Meadows Yard, Shrewsbury. The heads of 18 September 2026 put MEES on the landlord and ask for tenant cooperation. The EPC is Band D to 12 March 2029; particulars show about 2,400 sqm GIA. Clause 8.3 names energy-efficiency improvements; clause 9 gives absolute MEES entry and bars adverse EPC alterations. The agent wants a decision by Friday 16 October 2026.
The Slack thread of 8 October 2026 captures the typical mistake: MEES is only cooperation; upgrades are always recoverable; Band B by 2030 is already law; refuse access and an exemption follows. That reading does not hold on these clauses.
Disclaimer: Checkory provides AI support, not legal advice. Consult a qualified lawyer for binding decisions.
Duty is not payment
In practice, MEES duty and reg. 41 penalties sit on the landlord. Clauses 8.3 and 9 still shift cost, access, and rating. ‘Landlord’s problem’ does not delete those words.
How to separate MEES duty from lease cost allocation
Open the EPC, the heads of 18 September 2026, and clauses 8.3 and 9. Note that duty and fine sit on Raven Meadows Estates Ltd, yet the lease can still recover costs and control access and rating.
GOV.UK’s non-domestic MEES landlord guidance (updated 5 May 2026) states the EPC E floor unless a valid exemption is registered. The 2015 Regulations, regulation 41 puts financial and publication penalties on the landlord. The Law Society says the tenant is not liable for the MEES fine unless it sublets.
MEESCompliance’s who-pays page (updated 14 October 2026) states the same split. Heads that promise cooperation do not erase Service Costs that already name energy-efficiency improvements. The whole-lease checklist is the published commercial office lease review; this article covers only the green-lease cost block.

How to map today’s EPC E floor against the June 2026 proposal
Start with today’s floor: EPC E. Band D is not F or G. Then map the June 2026 proposal onto the particulars without deciding the measured area.
The GOV.UK interim response of 18 June 2026 proposes EPC B from 2031 only for buildings over 1,000 sqm; smaller stay on E; no 2027 C; secondary legislation still required. Mills & Reeve, 8 July 2026 flags that “building” versus unit is still unclear. Particulars say about 2,400 sqm — indicative only, not a measured survey and not clause 9.3.
Do not treat a 2027 C or 2030 B timetable as current law. Do not treat Band D as unlawful for Unit 6.
How to test whether clause 8.3 recovers energy upgrades
Put the heads next to Service Costs and clause 8.3. The definition includes energy-efficiency improvements; clause 8.3 takes a fair proportion as the landlord’s surveyor determines. There is no payback test, no cost-benefit sentence, and no prior-written-agreement limb.
Level Workspace, 12 August 2026 summarises RICS 2nd edition: improvements are not normally expected as service-charge costs; energy-efficiency costs might be legitimate only subject to the lease and proportionate tenant benefit. The BBP Green Lease Toolkit service-charge page treats savings-based contribution as a matter for agreement. RICS guidance does not override wide lease words. Leave the service-charge cap for a separate review. Narrow 8.3 or walk.

How to read absolute landlord entry on clause 9.2
Clause 9.2 lets the landlord enter on reasonable notice for EPC or 2015 Regulations works; the tenant shall afford all necessary facilities. No “at the Landlord’s expense”, no contribution formula, no consent gate.
GOV.UK lists a third-party consent exemption where consent cannot be obtained despite best efforts. The BBP note on extending the landlord’s right to do works warns that an absolute works right can remove that exemption for those works. The Slack plan — refuse access, register an exemption, keep the unit — fails here. Do not treat refusal as protection.
How to mark EPC-protection and return-rating covenants
Clause 9.1 absolutely bars alterations that adversely affect environmental performance or the EPC rating. Clause 9.3 returns no lower than Band D on the named EPC dated 12 March 2024. Neither funds Band B.
Burges Salmon’s note on Clipper Logistics v Scottish Equitable (6 April 2022) shows a County Court starting from landlord MEES duty on a 1954 Act renewal and allowing only a same-EPC return limb. That note does not rewrite agreed clause 9.1 or create a Band B funding duty. Yield-up belongs in another guide. Insurance rent is another England lease guide; return to 8.3 and 9.

Five-mark checklist before Friday — narrow or walk
After the five marks, you should see duty on the landlord with payment and access still on the lease; floor E still in force, with 2031 B only a proposal for larger buildings; 8.3 recovering without a benefit test; 9.2 absolute entry removing the consent story; and 9.1 and 9.3 protecting rating without funding Band B.
Then narrow 8.3 and 9 — payback, landlord expense, consent gate, or same-rating only — or do not sign on Friday 16 October 2026. Repairing covenants, service-charge caps, and dilapidations sit in other guides. Follow EPC → heads → 8.3 → 9 → narrow or walk. Use document analysis and the England commercial lease review tool as a first-pass — a quick extract of the file, not the decision.
Five marks before Friday
Separate duty from payment
MEES duty and reg. 41 penalties on the landlord; 8.3 and 9 still shift cost, access, and rating.
Map E versus the 2031 proposal
Floor E. June 2026 proposes B from 2031 only over 1,000 sqm after secondary legislation. ~2,400 sqm particulars are not a measured decision.
Test clause 8.3 recovery
Service Costs name energy-efficiency improvements with no benefit test. RICS does not delete those words.
Read clause 9.2 entry
Absolute entry for MEES works. No landlord expense. No consent gate. Refusal is not protection.
Mark 9.1 and 9.3
Adverse-alterations bar; return no lower than Band D. Neither funds Band B.
Narrow or walk
Edit 8.3 and 9, or do not sign Friday 16 October 2026. Do not sign off on the agent’s reading.
Five-mark green-lease cost checklist
| Mark | What the packet — the draft lease file set — shows | What you write |
|---|---|---|
| Duty / penalty | 2015 Regs; landlord penalty | Duty on landlord; payment still on lease |
| Timetable | EPC D; ~2,400 sqm particulars | Floor E; 2031 B proposal for >1,000 sqm |
| Clause 8.3 | Energy upgrades in Service Costs | Recovery with no benefit test — narrow or walk |
| Clause 9.2 | Absolute entry; no expense; no consent | Consent exemption is not protection |
| 9.1 / 9.3 | Adverse bar; return Band D | Protect rating; do not fund Band B |
Frequently asked questions
Who pays for MEES upgrade works under a commercial lease in England?▼
Can a landlord recover energy-efficiency improvements through the service charge?▼
Is EPC Band B by 2030 already the law for every commercial building?▼
Does refusing access help me keep the unit as it is?▼
Does a return-rating covenant make me fund Band B?▼
Is this the whole commercial lease checklist?▼
Mark clauses 8.3 and 9 before Friday
Upload the draft and extract Service Costs, absolute entry, and return-rating wording. A lawyer decides whether you narrow or walk.
Start document analysisWhat to do next
Document analysis
Upload the draft and extract clauses 8.3 and 9, Service Costs, and the return-rating wording.
ToolCommercial lease review tool for England
Point the same draft at the England commercial-lease review.
RelatedCommercial office lease checklist for England
The green-lease cost block is one pass. The rest of the lease sits in the published checklist.
RelatedHow to Review Commercial Lease Insurance Rent and Uninsured Risk in England
Insurance rent sits outside this MEES cost-allocation pass.
RelatedHow to Review Commercial Lease Dilapidations and Yield-Up in England
Open the sibling checklist after this screen.
RelatedHow to Review a Commercial Lease Break Clause in England
Open the sibling checklist after this screen.
Sources
- GOV.UK non-domestic MEES landlord guidance
- GOV.UK MEES interim response, 18 June 2026
- Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015, regulation 41
- Law Society — green leases and MEES
- Mills & Reeve — key changes to EPC and MEES, 8 July 2026
- MEESCompliance — who pays for commercial MEES upgrades
- Level Workspace — green retrofit service charge recovery
- BBP Green Lease Toolkit — service charge
- BBP Green Lease Toolkit — extending landlord’s right to do works
- Burges Salmon — Clipper Logistics v Scottish Equitable
Read also
Related guides